Defense contracting
Construction Equipment Manufacturing
Problem
Positioning for manual finish welding of 8,400 lb articulated loader main frames.
COMPLEXITY
Approach
12,000 lb 3-axis positioners (P3X) with custom tooling.
Result
- Reduced material handling
- Improved weld quality
- Consistent fit up with improved tooling